Cost Allocation in SAP CO
- What is cost allocation in SAP CO?
Cost allocation in SAP CO enables costs accumulated on sender objects (e.g. Cost Centers) to be transferred to other controlling objects according to defined rules. This makes it possible to allocate indirect costs to the organizational units that actually use the underlying resources or services.
The basic methods of cost allocation between Cost Centers include Distribution and Assessment. Both methods allow costs to be transferred from a sender to receivers, but they differ in how the allocated costs are presented.
1) Distribution preserves the original primary cost elements.
2) Assessment uses a secondary cost element.
In the following sections, both methods are presented using an example of cost allocation between Cost Centers, with a Statistical Key Figure used as the allocation basis.
- Statistical Key Figures as an allocation basis
Statistical Key Figures in SAP CO can be used as a basis for allocating costs among individual receivers. They represent measurable quantities related to the activities of a Cost Center, such as the number of employees, floor space, or number of workstations.

Fig. 1. Creation of the ZEMP Statistical Key Figure – Number of employees.
When creating a Statistical Key Figure, its type must also be specified. SAP allows an SKF to be defined as either a fixed value or a totals value. A fixed value remains valid in subsequent periods of the fiscal year until a new value is entered. A totals value, on the other hand, is recorded for a specific period and is not automatically carried forward to subsequent periods.
In this example, the ZEMP – Number of employees, statistical Key Figure was defined as a fixed value because the number of employees is intended to serve as the allocation basis in subsequent periods until it is updated.
The following values were recorded for the two receiver Cost Centers:
1) Cost Center IT03 – 10 employees
2) Cost Center IT04 – 20 employees

Fig. 2. Recording values of the ZEMP Statistical Key Figure for Cost Centers IT03 and IT04.
Based on the recorded values, the system can determine the allocation ratio between the receivers. In this case, the ratio is 1/3 for IT03 and 2/3 for IT04.
The same Statistical Key Figure was then used as the allocation basis in both the Distribution and Assessment cycles, allowing the two methods to be compared under equivalent allocation conditions.
- Distribution
Distribution enables costs to be transferred from a sender object to receiver objects while preserving the original primary cost elements. This means that after Distribution has been executed, the original structure of the allocated costs remains visible on the receiver Cost Centers.
In this example, actual costs were posted to the sender Cost Center IT.MAIN3 using two different primary cost elements. An amount of 6 000 EUR was posted to each of the cost elements 61003000 and 61004000, resulting in a total of 12 000 EUR. These costs were then distributed between Cost Centers IT03 and IT04 in proportion to the values of the previously recorded ZEMP Statistical Key Figure.

Fig. 3. Actual costs of Cost Center IT.MAIN3 before Distribution.
Creating the Distribution cycle
To perform the Distribution, the BLOG01 – IT cost distribution cycle was created for fiscal year 2026. A cycle is a structure containing individual segments that define the cost senders and receivers, the scope of costs to be allocated, and the allocation basis.

Fig. 4. Creation of the BLOG01 Distribution cycle.

Fig. 5. Definition of the sender, receivers, and cost elements in the BLOG01 distribution cycle segment.
The BLOG01 distribution cycle was created and the scope of costs subject to allocation was defined. Cost Center IT.MAIN3 and primary cost elements 61003000–61004000 were specified as the sender and sender cost elements. Cost Centers IT03 and IT04 were specified as the receivers.

Fig. 6. ZEMP Statistical Key Figure as the receiver tracing factor in the Distribution cycle.
Actual Statistical Key Figures were selected as the receiver tracing factor, and the previously created ZEMP – Number of Employees SKF was specified. The system uses the recorded SKF values for Cost Centers IT03 and IT04 to determine the cost distribution ratio between the receivers. Since values of 10 and 20 were recorded for IT03 and IT04 respectively, the costs are distributed between the receivers in a 1/3 to 2/3 ratio.
After executing the Distribution cycle, the costs accumulated on Cost Center IT.MAIN3 were fully transferred to the receiver Cost Centers. The sender shows credits to cost elements 61003000 and 61004000 totaling 12 000 EUR.

Fig. 7. Credit to Cost Center IT.MAIN3 after executing the distribution cycle.
According to the values of the ZEMP Statistical Key Figure, the costs were distributed in a ratio of 1/3 to IT03 and 2/3 to IT04. Cost Center IT03 was charged 4 000 EUR, while Cost Center IT04 was charged 8 000 EUR.
An important characteristic of Distribution is that the original primary cost elements are preserved. On both receiver Cost Centers, the costs remain posted under cost elements 61003000 and 61004000, i.e. the same cost elements under which they were originally posted to the sender Cost Center IT.MAIN3.

Fig. 8. Costs of Cost Center IT03 after Distribution.

Fig. 9. Costs of Cost Center IT04 after Distribution.
- Assessment
In this example, a scenario analogous to the Distribution scenario was used, with separate Cost Centers to ensure that the presented results remain clear.
Actual costs totaling 12 000 EUR were posted to the sender Cost Center IT.MAIN4, with 6 000 EUR posted to each of the primary cost elements 61003000 and 61004000. Cost Centers IT05 and IT06 were used as receivers, with ZEMP Statistical Key Figure values of 10 and 20, respectively.

Fig. 10. Actual costs of Cost Center IT.MAIN4 before Assessment.
For Cost Centers IT05 and IT06, ZEMP Statistical Key Figure values of 10 and 20 were recorded respectively, maintaining the same allocation ratio as in the Distribution example.
To perform the Assessment, the BLOG02 – IT cost assessment cycle was created for fiscal year 2026. A segment was defined within the cycle to specify the sender and receivers, the scope of costs subject to Assessment, and the allocation basis.

Fig. 11. Creation of the BLOG02 Assessment cycle.
In the Assessment cycle segment, secondary cost element 90630000 was specified to transfer the costs to the receiver Cost Centers. Unlike Distribution, the costs are not presented at the receivers under the original primary cost elements 61003000 and 61004000. Instead, they are aggregated and transferred using assessment cost element 90630000.

Fig. 12. Definition of secondary cost element 90630000 in the BLOG02 Assessment cycle segment.
The sender and receivers were then defined. Cost Center IT.MAIN4 and primary cost elements 61003000–61004000 were specified as the sender and sender cost elements, while Cost Centers IT05 and IT06 were specified as the receivers. Therefore, the Assessment covers costs accumulated under the same primary cost elements as those used previously in the Distribution example.

Fig. 13. Definition of the sender, receivers, and cost elements in the BLOG02 assessment cycle segment.
As in the Distribution example, the actual ZEMP Statistical Key Figure was specified as the receiver tracing factor. Values of 10 and 20 were recorded for Cost Centers IT05 and IT06 respectively, resulting in an allocation ratio of 1/3 to 2/3.
After executing the Assessment cycle, the costs accumulated on Cost Center IT.MAIN4 were fully transferred to the receiver Cost Centers. Unlike Distribution, the sender was credited using assessment cost element 90630000, for a total amount of 12 000 EUR.

Fig. 14. Credit to Cost Center IT.MAIN4 after executing the assessment cycle.
According to the values of the ZEMP Statistical Key Figure, the costs were assessed in a ratio of 1/3 to IT05 and 2/3 to IT06. Cost Center IT05 was charged 4 000 EUR, while Cost Center IT06 was charged 8 000 EUR. Unlike distribution, the original primary cost elements 61003000 and 61004000 are not visible on the receiver side. The costs were aggregated and posted to Cost Centers IT05 and IT06 using assessment cost element 90630000.

Fig. 15. Costs of Cost Center IT05 after assessment.

Fig. 16. Costs of Cost Center IT06 after assessment.
- Summary
The examples presented above demonstrate the fundamental difference between the two allocation methods. With distribution, the original primary cost elements are preserved on the receiver Cost Centers, whereas with assessment, costs are transferred using a secondary cost element. The choice of method therefore depends primarily on whether the original cost element structure needs to be retained after the allocation.